ADVERTISEMENT.
Homepage Slideshow
‘Leaked’ Chilima’s Public Sector Reform Report Divides Opinion
A document purported to be the long-hidden report on the review of public service systems in the country which was instituted by President Lazarus Chakwera in 2021 is circulating on social media and being discussed in the public domain, causing divided opinions.
Chakwera Urges Malawians to Draw Inspiration from Martyrs
Nkhata Bay, Feb 3: President Lazarus Chakwera has asked Malawians to emulate selflessness and patriotism demonstrated by the country’s martyrs in order to achieve meaningful national development.
Bvumbwe Guardian Shelter Remains Closed for 13 Years
A completed guardian shelter at Bvumbwe Health Center in Thyolo is yet to be opened after a contractor reportedly withheld keys since 2010 due to a payment dispute.
ACB Records 43 AIP Fraud Cases in 2023/24 Farming Season
The Anti-Corruption Bureau (ACB) says it received 43 corruption related cases under the 2023/2024 Affordable Inputs Programme (AIP).
Public Funds Wasted As Cooperative Factory Shell Stays Idle for 13 Years
Over a decade ago, Aubrey Mwale, a small holder farmer from the area of Traditional Authority Mlumbe in Zomba had high hopes that the construction of a meat processing factory building for his Bwaila Meat Cooperative by the government would transform his community’s economic status.
The Blantyre Water Board (BWB) has complained that it is operating at a loss due to huge electricity and chemical costs.
The Blantyre Water Board (BWB) has justified the delay to recommence installation of prepaid water meters to residents due to long procurement processes and Covid-19 restrictions.
The Blantyre Water Board (BWB) has signed a contract with an Indian company, TATA Consulting Engineers to conduct a feasibility study and a detailed design for the development of a 30 megawatts solar power plant at walkers’ ferry Nkula site.
The Blantyre Water Board (BWB) has shut down Mudi Treatment Plant amid complaints that some residents have been receiving contaminated water.
Blantyre Water Board (BWB) says heavy siltation in Mudi Dam is affecting the pumping of water.
Copyright © 2019 ZODIAK BROADCASTING STATION. All rights reserved. External links are provided for reference purposes.
ZODIAK BROADCASTING STATION is not responsible for the content of external Internet sites.
DESIGNED BY ZODIAK IT TEAM.